Culver’s – Strongsville, OH
This ground-up construction included demolishing an existing building on the site and installing Res-Tek flooring in the kitchen/prep area in lieu of ceramic tile. We undercut the parking lot and building pad to remove and replace poor soils found on the site. We installed an extensive underground stormwater detention system.
The project was completed during the winter months, which required us to pave the parking lot in the spring.
Our crew consisted of 5 people and was completed in 120 days. The building has 5100 square feet and a Verisco Roofing System.